KCP&L has been planning for a consolidated training facility and the construction is now complete.  Landworks Studio assisted with the conceptual master plan, planning approvals and overall site work design.  

Two buildings are included in the plans; the Safety and Training Center and  the Pole Training Facility,   The site includes BMP elements, solar panels and a wind turbine, a pond for storm water collection and reuse, trails, wooded areas and outdoor spaces for employees.  

project features